|
Sinuously spanning rivers and gorges, these structures
carry natural gas to new territories. Four bridges of different
slopes and lengths were built using methods and procedures detailed
by Somerset.
The complicated rigging and pulling devices were designed,
along with the anchorages, geometry and tensioning necessary to
assemble the spans. Each piece of temporary rigging and hardware
was re-used from bridge to bridge.
|