For all the existing fixed spans on this major widening
and refurbishing project, we produced special procedures for implementation.
Our innovative method for widening the two 215 foot
arches was to temporarily brace each arch line and using eight horizontally
mounted hydraulic screw actuators, to slide the open spans on UHMW/PE
skid support beams. We also provided designs and procedures to simultaneously
jack a three span continuous, 450 foot long truss approach bridge
to allow the main bearings to be changed. For the new construction
we designed special built temporary supports for a three span, 525
foot haunched C.I.P. box structure.
|