Imperial Oil Refinery

Ioco, B. C.

 

Somerset carried out the on-site construction engineering for this key shut-down operation at Imperial Oil, involving the major replacement of the catalytic regenerator head. Due to limited access, we specified a 300 ton capacity ringer crane. The design of all temporary structures, rigging and crane layouts was provided by Somerset.

 







 